Church Street drainage ‘only temporary’
Contractors say they will be replacing concrete drainage mouldings on Church Street once the permanent granite channels arrive.
TAL say that temporary drainage channels - which are blocked at the kerbside - have been put in place as a short term measure.
“When the granite channels are received, they will return and change them over as quickly as possible,” said a spokesman.